Skip to content
animorio
IT
All components

Daily plan todo list

Lists, Hover, SVGGSAP, CSS onlyMediumCompressed weight: Demo 9.2 KBGSAP 28 KBFreeDownload the zip

The Today card of Daywise, a made-up planner app, white on white like a premium shot: on the left the hours from 8 to 18 with the blocks of the day (meeting, call, gym, work, groceries), on the right the to-do list with checkboxes. A thin orange line with the time in a tag walks slowly down the day: the block it is in lights up and fills, the one it leaves closes, fades and a small check draws itself where its time was. The tasks tick off with the box filling on a spring, a line striking the words and the task carried to the bottom of the list while the others settle; the ring and the count «1 of 5 done» move on with the digit rolling.

The code

A folder that runs on its own: index.html, style.css, script.js and the libraries from a CDN. The React and Vue tabs hold the same demo as a ready component, which switches its animations off when it leaves the page.

<!doctype html>
<!--
  "Daily plan todo list" from Animorio · https://animorio.com
  License: free on your own sites and your clients’ sites, paid work included.
  Not for resale, redistribution, templates or code collections · https://animorio.com/en/license/
-->
<html lang="en">
<head>
  <meta charset="utf-8">
  <meta name="viewport" content="width=device-width, initial-scale=1">
  <title>Daily plan todo list</title>
  <link rel="stylesheet" href="https://cdn.jsdelivr.net/npm/@fontsource-variable/mona-sans@5.3.0/wdth.css">
  <link rel="stylesheet" href="style.css">
</head>
<body>
  <main class="stage">
    <!-- the Today card of Daywise, a made-up planner app: the hours of the day with their blocks on the left, the
         to-do list on the right. A thin line with the time in a tag walks down through the day; the blocks it leaves
         behind close with a small check, and the tasks tick themselves off and slide to the bottom of the list -->
    <article class="day" data-card aria-label="Today in Daywise">
      <header class="day__head">
        <div class="day__title">
          <p class="day__brand">
            <svg class="day__mark" viewBox="0 0 16 16" aria-hidden="true"><path d="M2.5 11.5a5.5 5.5 0 0 1 11 0"/><path d="M1.5 13.5h13"/></svg>
            <span>Daywise</span><span class="day__sep">·</span><span>Wed 18 Nov</span>
          </p>
          <h1 class="day__today">Today</h1>
        </div>
        <div class="day__progress" role="progressbar" aria-label="Tasks done" aria-valuemin="0" data-progress>
          <svg class="ring" viewBox="0 0 28 28" aria-hidden="true">
            <circle class="ring__track" cx="14" cy="14" r="11"/>
            <circle class="ring__fill" cx="14" cy="14" r="11" pathLength="1" data-ring/>
            <path class="ring__check" d="M9.6 14.3l3 3 5.8-6.2" pathLength="1" data-ring-check/>
          </svg>
          <p class="day__count"><span class="roll" data-roll aria-hidden="true"></span><span class="sr" data-done-sr></span> of <span data-total></span> done</p>
        </div>
      </header>

      <div class="day__body">
        <section class="plan" aria-label="Schedule">
          <div class="plan__track" data-track>
            <div class="plan__hours" data-hours aria-hidden="true"></div>
            <div class="plan__rule" aria-hidden="true"><span class="plan__elapsed" data-elapsed></span></div>
            <ol class="plan__blocks" data-blocks></ol>
            <div class="now" data-now aria-hidden="true">
              <span class="now__line"></span>
              <span class="now__tag" data-now-tag>8:00</span>
            </div>
          </div>
        </section>

        <section class="todo" aria-label="To do">
          <p class="todo__head"><span>To do</span><span class="todo__left" data-left></span></p>
          <ul class="todo__list" data-list></ul>
        </section>
      </div>
    </article>
    <p class="sr" aria-live="polite" data-live></p>
  </main>

  <script src="https://cdn.jsdelivr.net/npm/gsap@3.15.0/dist/gsap.min.js"></script>
  <script src="script.js"></script>
</body>
</html>

Playground

Change values, colours and text with the controls and watch the animation respond live. Or write in the code yourself. Then download the folder with your changes.

59 values to change

Or ask your AI assistant for it

With the Animorio connector, Claude Code, ChatGPT, Cursor or VS Code take it from here, guide included, and fit it into your project. Paste this request:

Take “Daily plan todo list” from Animorio and fit it into my site
Platform licenseFree on your sites and your clients’ sites. Want it inside a website builder, a template platform or a client dashboard? There’s a license for agencies and platforms.

What it does

On a white ground there is a single white card with wide corners, its one pixel edge, a thread of orange light on the top edge and three layers of soft shadow. At the top Daywise with its mark, the date and Today written large; on the right a pill with the ring of tasks done and «1 of 5 done». Below, on the left, the column of hours from 8:00 to 18:00, small and grey, with a very thin line for each hour and five light grey blocks: Team sync, Call with Ines, Gym, Deep work, Groceries, each with its start time and, where there is room, a note. On the right the To do list with five tasks, each with its box, its name and its label (Work, Health, Home…); the one already done sits at the bottom, struck through. A one pixel orange line with the time in a solid tag walks slowly down from 8 to 18 and the minutes in the tag run; the hours in the column close to the tag fade so they never end up under it, and an orange thread on the column’s edge marks the time gone. The block the line is in turns white with an orange bar and edge and fills with a very light orange up to the current time; when the line leaves it, the block closes: it turns grey, its name fades, the time slides away and a small check draws itself in its place, with a little elastic settle. Ticking a task, the box shrinks and comes back on a spring, fills with orange and the white tick draws itself; a line runs across the words from the left, the words fade, and a moment later the task lifts as if carried and slides to the bottom of the list while the others move up and settle by a pixel. The ring moves on, the digit rolls and «4 left» becomes «3 left»; with all of them done a check draws itself inside the ring and All clear appears. Unticking, everything goes back and the task returns to its place. Under the mouse tasks and blocks lift by a pixel. On its own the day runs, two tasks tick off, then the line goes back to 8 and the tasks are to do again.

How it works

The day in percentages

The hours and blocks are built from the BLOCKS and TASKS lists: each block has its top and height as a percentage of the column’s height (minutes from the start divided by the minutes of the day), so it fits any box without recalculating. Only the time line uses pixels, measured again with a ResizeObserver.

The time line and the blocks

A tween takes a number of minutes from 0 to the end of the day; on every update the line moves, the tag changes only when the minute changes, the nearby hours fade by their distance in pixels and every block works out whether it is past, current or next. Only when the state changes do the check (strokeDashoffset on a path with pathLength 1) and the settle start. The line sits under the blocks: inside the current one, the edge of the fill draws it.

The box on a spring

Ticking, the box starts at scale 0.8 and comes back with an elastic.out, the fill grows from the centre with a back.out, the tick draws itself and the line through the words grows with scaleX from the left; unticking, the line pulls back to the right.

The FLIP reorder

The positions of all the tasks are read, they are put back in the new order (the ones to do in their order, then the done ones in the order they were done), their y is reset and they are measured again: each task starts from the difference and slides to zero. The carried one is above the others, grows a little and comes back with a back.out; the others settle by a pixel.

The ring and the digit

The ring is a circle with pathLength 1 whose strokeDashoffset is 1 minus the share done; the digit is a column from 0 to 9 in a box 1ch wide that slides with yPercent and a back.out.

Values to change

NameFileDefaultWhat it changes
DAY_STARTscript.js8The first hour on the card.
DAY_ENDscript.js18The last hour on the card.
BLOCKSscript.jsTeam sync, Call with Ines, Gym, Deep work, GroceriesThe blocks of the day: name, start time, end time and a note.
TASKSscript.jsSend the invoice, Book the dentist, Water the plants, Buy oat milk, Renew passportThe tasks when the page opens: text, label and whether they are already done (nine at most).
DAY_SECONDSscript.js9The seconds the time line takes from the first hour to the last.
SETTLEscript.js0.32The pause between the tick and the task sliding to its place.
MOVEscript.js0.62The seconds a task takes to slide to its place.
LIFTscript.js1.035How much the task grows while carried.
SPEEDscript.js1The speed of the day running on its own.
AUTOscript.jstrueThe day running on its own until someone touches the card.
--accentstyle.css#f2542dThe orange of the time line, the boxes and the ring.
--blockstyle.css#f4f4f6The grey of the blocks of the day.

Try them in the Playground

When to use it

On the Today screen of a planner, productivity or habit app, on a work app’s dashboard or on a digital planner’s page: wherever the day’s appointments and the tasks need to be seen together, and where you stand is clear at a glance.

On phones

The card takes almost the whole width and the height of an hour follows the screen’s height, so the ten hours and the five tasks fit the box; in narrow blocks the start time hides and the name stays. A tap on a task ticks or unticks it, with the same spring.

With reduced motion

No walking line, springs or sliding tasks: the card fades in with the line still at midday and the past blocks closed; ticking, the fill, the tick and the line through the words fade in and the task fades in at its new place.

Pitfalls

  • The reorder reads positions with GSAP’s y still in them: before measuring again the y tweens must be killed and y reset to zero, otherwise a second click during the slide made the list jump.
  • The time line over the blocks cut through the words of the current block: it now sits under the blocks, and inside the current one it is drawn by the edge of the fill, which grows in height (with scaleY the one pixel edge got thinner).
  • The carried task crossed the others with its white background still transitioning and the words underneath showed through: the carried task’s background has no transition.
  • A digit in a box with overflow hidden has its baseline at the box’s bottom: aligned with vertical-align bottom and the same line height as the row, otherwise it rose above «of 5 done».
  • The ticks use pathLength 1: GSAP would round strokeDashoffset to the pixel, so the empty autoRound plugin sits at the top of the script.

Libraries

GSAP 3.15.0, Mona Sans (font variabile) 5.3.0.

Compressed with gzip, the three demo files weigh 9.2 KB; the libraries: GSAP 28 KB.

Testing

Tested on 18 November 2026

  • Desktop: Done
  • Phone: Done
  • Reduced motion: Done
  • Safari on iPhone: To do

License

Use it in your own projects and in your clients’ projects. Do not resell it or redistribute it as is. GSAP stays under its own Standard license. Full license.

All components